CityCA
Posted
Aug 19, 2026
Oct 5, 2026
Pacific Avenue Corridor Improvement Project
Work consists of mobilization & demobilization; class "a" field office; scheduling; stormwater best management practices (bmp's); traffic control; temporary water-filled barrier system; monument restoration & perpetuation (survey marker & corner record file); adjust survey monument casing & cover (well); construct survey ties; construction staking; la metro flagging, coordination & training. Unclassified excavation; remove existing tree; remove existing full depth asphalt concrete (ac) pavement (r&r, digouts, and slot paving); remove existing concrete (sidewalk, curbs, curb and gutter, curb ramps, driveways); remove existing bus bench; remove bus shelter; cold mill 2" ac pavement; remove & salvage existing street light.