CityNY
Posted
Aug 31, 2026
Jan 4, 2027
Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP RFP
Work includes demolition of a total of six (6) MSP motors, cone check valves, actuators, suction and discharge piping; the installation of six (6) new MSP motors, cone check valves, actuators, suction and discharge piping; witness shop testing; system startup; field testing; preparation of as-builts; preparation of o&m manuals for the new equipment; and training.
