FederalMS
Posted
Oct 15, 2026
Oct 20, 2026
Description: NASA/NSSC issued a special notice for CONDUCTOR CABLING and intends to make a sole-source award to New England Wire Technologies Corp. under FAR 12.102(a). NASA is requesting capability statements—not price quotes—by October 20, 2026, to determine whether the requirement should be competed; quotes will not be evaluated. The requirement is for jacketed three-conductor 12 AWG cable with 259 strands of 36 AWG bare-copper conductors and specified insulation, with performance at NASA Glenn Research Center and an estimated delivery lead-time date of December 31, 2026.
Federal · MS, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from NASA Shared Services Center.
Adjacent opportunities open for bidding right now.
FederalMS
Posted
Oct 15, 2026
Oct 20, 2026
NASA/NSSC issued a special notice for CONDUCTOR CABLING and intends to make a sole-source award to New England Wire Technologies Corp. under FAR 12.102(a). NASA is requesting capability statements—not price quotes—by October 20, 2026, to determine whether the requirement should be competed; quotes will not be evaluated. The requirement is for jacketed three-conductor 12 AWG cable with 259 strands of 36 AWG bare-copper conductors and specified insulation, with performance at NASA Glenn Research Center and an estimated delivery lead-time date of December 31, 2026.
CountyOH
Posted
-
Oct 21, 2026
Work include cabling installation.
Washington Unified School District
School DistrictCA
Posted
Oct 14, 2026
Oct 28, 2026
Work consists of internal connections-cabling.
San Bernardino City Unified School District
School DistrictCA
Posted
Sep 29, 2026
Oct 27, 2026
Work includes installation of cabling and pathways to support wired and wireless data network systems for classrooms, offices, gymnasiums, libraries, multipurpose rooms, outdoor spaces, high-density wireless environments, and other educational facilities throughout the district, including infrastructure supporting wi fi 6e, wi fi 7, multigigabit connectivity, and future standards based wireless technologies; new installation of the mdf (main distribution frame) to idf (intermediate distribution frame) and idf to ldf (local distribution frame) backbone cabling using laser-optimized om4 multi-mode fiber optic cabling, or single mode fiber optic cabling (due to distance). See outside link.