Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Free Library of Philadelphia
Work includes concrete sidewalk repairs. Remove and replace the entire front sidewalk, including the adjoining curb and left-side handicap curb ramp area. Roadside curb replacement: remove approximately 105 LF of existing roadside curb and install new concrete curb by monolithic concrete pour, including the adjacent sidewalk section. Ada ramp construction: design and construct a new ADA-compliant handicap curb ramp at the start of the left-side front sidewalk. Right-side walkway - remove and replace the interior walkway on the right-hand side measuring approximately 39 feet by 4 feet. Left-side walkway (book drop area): remove and replace two (2) concrete flags, each approximately 45" by 48".
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Polk County
Provide concrete sidewalks repairs and replacements to various locations.
Posted Date
Nov 4, 2025
Due Date
Nov 19, 2025
Release: Nov 4, 2025
Polk County
Close: Nov 19, 2025
Provide concrete sidewalks repairs and replacements to various locations.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Dunbar Housing Authority
Work include concrete sidewalk & storm sewer replacement.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Release: Nov 7, 2025
Dunbar Housing Authority
Close: Dec 11, 2025
Work include concrete sidewalk & storm sewer replacement.
AvailableLee County
Sidewalk repairs.
Posted Date
Oct 27, 2025
Due Date
Nov 18, 2025
Release: Oct 27, 2025
Lee County
Close: Nov 18, 2025
Sidewalk repairs.
Town of Friday Harbor
Grind portions of existing cement concrete sidewalks at multiple locations, which have settled and/or cracked.
Posted Date
Nov 6, 2025
Due Date
Nov 21, 2025
Release: Nov 6, 2025
Town of Friday Harbor
Close: Nov 21, 2025
Grind portions of existing cement concrete sidewalks at multiple locations, which have settled and/or cracked.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo β