Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
General concrete replacement: curb and gutter replacement for 2 blocks. Additional replacement of existing city of aspen sidewalk in the right of way (row)
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: -
Close: Feb 4, 2026
Provide 2026 concrete replacement for city parks.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes all labor and materials necessary for the removal and replacement and placement of portland cement pavement, traffic control and other incidental items. Includes 14,000 SY of 7" concrete street removal - replacement with 7" non-reinforced, 7.27 sack, PCCP; 500 LF of 6" concrete vertical PCCP curb; see outside link.
Posted Date
Jan 2, 2026
Due Date
Jan 26, 2026
Release: Jan 2, 2026
Close: Jan 26, 2026
The scope of work includes all labor and materials necessary for the removal and replacement and placement of portland cement pavement, traffic control and other incidental items. Includes 14,000 SY of 7" concrete street removal - replacement with 7" non-reinforced, 7.27 sack, PCCP; 500 LF of 6" concrete vertical PCCP curb; see outside link.
AvailableWork includes approx. 44,000 SF of 4" concrete sidewalk replacement; 1,500 SF Of 6" concrete sidewalk replacement; 1,000 SF Of 6" concrete drive approach replacement; 300 LF of concrete curb or concrete curb and gutter replacement approximately 10 sq. Ft. Of detectable warning field install
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Work includes approx. 44,000 SF of 4" concrete sidewalk replacement; 1,500 SF Of 6" concrete sidewalk replacement; 1,000 SF Of 6" concrete drive approach replacement; 300 LF of concrete curb or concrete curb and gutter replacement approximately 10 sq. Ft. Of detectable warning field install
AvailableThe City of Sunset Hills, Missouri is seeking bids from qualified contractors for the replacement of approximately 3,386 square yards of 7-inch thick concrete slabs on streets.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
The City of Sunset Hills, Missouri is seeking bids from qualified contractors for the replacement of approximately 3,386 square yards of 7-inch thick concrete slabs on streets.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →