CountyTX
Aug 18, 2026
Closes
Sep 22, 2026
Concrete Pavement Repairs-Bar X-Phase IV
Work includes approx 308 CY excavation (roadway); 10,525 SY l8" lime treated (existing material); 430 LF of temporary sediment control fence.
Description: Brazoria County is soliciting competitive sealed proposals for Concrete Pavement Repairs-Bar X-Phase VI. The County's authorization states that competitive sealed proposals were determined by the Purchasing Agent to be the procurement method in the best interest of the County. The procurement will use funds from the department's approved Fiscal Year 2026 budget.
County · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyTX
Aug 18, 2026
Closes
Sep 22, 2026
Work includes approx 308 CY excavation (roadway); 10,525 SY l8" lime treated (existing material); 430 LF of temporary sediment control fence.
Special DistrictTX
Jul 15, 2026
Closes
Aug 26, 2026
This project focuses on performing targeted concrete and pavement repairs at the General Cargo Terminals, specifically in CARE and Jacinto Port Terminals, to restore structural integrity, improve safety, and extend the service life of critical port infrastructure. The work includes the repair and replacement of deteriorated concrete slabs, pavements, and associated terminal surfaces impacted by heavy cargo operations, equipment loading, and environmental exposure.
CityNV
Jul 30, 2026
Closes
Aug 25, 2026
The work generally consists of improvements to amenities. Work includes including a restroom, parking lot, splash pad area, shade structures, fence/gate, site signage, picnic seating area, trash receptacles, retaining walls, landscaping, irrigation, and trails.
Wisconsin Department of Transportation
State AgencyWI
Aug 11, 2026
Closes
Sep 15, 2026
Work includes : 403,060 SY removing asphaltic surface milling; 5,910 CY excavation common; 198 SY concrete pavement replacement; 21,950 TON hma pavement 4 mt 58-28 s; 173,460 LF asphaltic rumble strips, shoulder divided roadway; 13 LF culvert pipe corrugated steel 30"; see attached file.
Procurement and program contacts connected to Brazoria County.