Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx; 600 LF of temporary fiber roll; 800 LF of crack sealing; 14,200 SF of drive steel sheet piling (Vibration); 14,200 SF of furnish steel sheet piling; 630 CY of structure excavation; 630 CY of lightweight concrete backfill; see outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 688 CY excavation, channel, 316 CY excavation, channel, waste, 187 SY subbase, modified, 12 in, 72 LF sewer pipe encasement, 19 LF storm sewer, trenched, rcp, class III, 24 in, 1 EA pipe apron, concrete, 24 in. W/ apron guard and footing, 32 lf removal of storm sewer less than or equal to 24 in, 165 LF tile, pvc, unspecified diameter, remove, relocate , and reconnect, manhole, storm sewer, sw-401, 48 in (EA). See outside link.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Work includes 688 CY excavation, channel, 316 CY excavation, channel, waste, 187 SY subbase, modified, 12 in, 72 LF sewer pipe encasement, 19 LF storm sewer, trenched, rcp, class III, 24 in, 1 EA pipe apron, concrete, 24 in. W/ apron guard and footing, 32 lf removal of storm sewer less than or equal to 24 in, 165 LF tile, pvc, unspecified diameter, remove, relocate , and reconnect, manhole, storm sewer, sw-401, 48 in (EA). See outside link.
AvailableThe South Carolina Department of Social Services is soliciting fixed-price statewide services to provide secure temporary stabilization beds for vulnerable adults in the care or custody of the SCDSS APS system, including nursing facility or licensed residential/assisted living placements. The solicitation (5400027605) defines a one-year base period with up to four one-year renewals and includes proposal timelines and a link to the original SCEIS solicitation for full documentation.
Posted Date
Nov 15, 2024
Due Date
Feb 2, 2030
Release: Nov 15, 2024
Close: Feb 2, 2030
The South Carolina Department of Social Services is soliciting fixed-price statewide services to provide secure temporary stabilization beds for vulnerable adults in the care or custody of the SCDSS APS system, including nursing facility or licensed residential/assisted living placements. The solicitation (5400027605) defines a one-year base period with up to four one-year renewals and includes proposal timelines and a link to the original SCEIS solicitation for full documentation.
AvailableThe project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
Posted Date
Dec 31, 2025
Due Date
Feb 17, 2026
Release: Dec 31, 2025
Close: Feb 17, 2026
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
AvailableMeadows Northland Arlington Street Stabilization Project is an Invitation for Bid (Bid 7-2026) issued by Lexington-Fayette Urban County for street stabilization work. The solicitation was issued on 2026-01-15 and bids are due on 2026-02-05 at 2:00 PM ET, with questions due by 2026-01-28 at 12:00 PM ET. Bid documents (a bid package PDF and an Excel bid schedule) are listed on the buyer's procurement portal but require login/registration to download.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Meadows Northland Arlington Street Stabilization Project is an Invitation for Bid (Bid 7-2026) issued by Lexington-Fayette Urban County for street stabilization work. The solicitation was issued on 2026-01-15 and bids are due on 2026-02-05 at 2:00 PM ET, with questions due by 2026-01-28 at 12:00 PM ET. Bid documents (a bid package PDF and an Excel bid schedule) are listed on the buyer's procurement portal but require login/registration to download.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →