Aug 11, 2026
Closes
Aug 28, 2026
Comstock Bridge Parking Lot Paving Project
Work inlcudes paving of the existing gravel/aggregate lot, and drainage improvements of the surrounding area of the new paved lot footprint, the existing lot is a mixture of gravel, sand and other aggregate materials.