CityAZ
Posted
-
Dec 10, 2026
104450 - South Florence Street @ Ash Avenue - Roundabout Project RFP
Roundabout Project.
Description: Project consists of the construction of a new community garden and associated site improvements. Work includes the installation of raised CMU (concrete masonry unit) garden beds, a retrofitted shipping container to serve as storage and program space, a shade structure canopy, a seat wall, steel fencing with a roll gate and swing gate, a CMU perimeter wall, concrete unit pavers, stabilized decomposed granite paving, concrete headers, a decorative water feature, site lighting and electrical improvements, grading, site furnishings and amenities, and landscape and irrigation improvements necessary to support the community garden and enhance the overall functionality, accessibility, and aesthetics of the site.
City · AZ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityAZ
Posted
-
Dec 10, 2026
Roundabout Project.
CityPA
Posted
Sep 5, 2026
Oct 6, 2026
Milling and paving of South Main Street from S.R. 309 to Kirby Ave, base repair as needed, remove existing paved swale areas and install new paved swales, install new paved cutback area, installation of a new Type M inlet (in between 8 South Main Street and 11-13 South Main Street), new 15” HDPE pipe to connect to existing inlet at southeast corner of the intersection of South Main Street and Kirby Ave, removal of debris in existing inlets and inlet riser adjustments, as needed
CityOH
Posted
Sep 26, 2026
Oct 8, 2026
The Village of Coal Grove is soliciting sealed bids for the Memorial Street Paving Project. Bids are due at Coal Grove Town Hall by 3:00 p.m. on October 8, 2026, with the public bid opening anticipated for 5:30 p.m. that day. This is a street-paving procurement, not a grant program.
CityMO
Posted
Sep 28, 2026
Oct 15, 2026
Work includes removal and replacement of storm sewer structures and piping, water main, concrete pavement, and other related construction