CityTX
Posted
Aug 13, 2026
Sep 15, 2026
Robinson Road Segment 1 Street Reconstruction Project
Robinson road segment 1 street reconstruction project.
Description: Included are waterline, storm sewer, curb and gutter, sidewalk, and street improvements. Also included is the milling and resurfacing of another portion.
City · OH, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Aug 13, 2026
Sep 15, 2026
Robinson road segment 1 street reconstruction project.
CityIL
Posted
Sep 3, 2024
Sep 29, 2026
This RFP is for the pavement reconstruction along Evergreen Avenue from approximately 150 feet west of Sherwood Park intersection to 200 feet east of Oceola Street intersection, including associated reconstruction work.
CountyNM
Posted
Jan 4, 2026
Sep 23, 2026
Provide construction services, work includes roadway reconstruction, curb & gutter, sidewalk, ADA ramps, storm drain, drainage structures, traffic control, erosion control, utilities, pedestrian hybrid beacon, permanent signing & striping, drainage pond excavation, miscellaneous construction.
CityMN
Posted
Sep 3, 2026
Sep 29, 2026
10, 600 CY excavation common (p); 60 LF sanitary manhole; 6,100 CY aggregate base class 5 (cv); 3,200 LF 6"-8" PVC watermain; 4600 ton bituminous surfacing; 6,400 LF b618 curb & gutter; 2600 LF 12"-42" storm sewer pipe; 2,,800 SY concrete walk/driveway pavement; 175 LF storm structures; 1.5 AC returf establishment; 1,870 LF 8" sanitary sewer; 1,600 LF 4" pavement striping.