School DistrictMI
Posted
-
Oct 1, 2026
Collins Elementary and Walsh Elementary Chiller Replacement (Request for Proposal)
Work include chiller replacement.
Description: Provide turnkey roof-top chiller replacement services which includes providing equipment, labor, materials, and all related work necessary for complete installation and operational functionality. The replacement chiller must be of similar tonnage, must be air-cooled, must be equipped with low ambient, and must include a sound dampening package to maintain lower noise levels during operation.
County · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictMI
Posted
-
Oct 1, 2026
Work include chiller replacement.
School DistrictUT
Posted
Sep 22, 2026
Oct 19, 2026
Proposals for an air cooled chiller replacement project.
CityRI
Posted
-
Oct 5, 2026
Seeking proposals for the upgrade/replacement of the classical hs chiller and the rooftop units.
Posted
Sep 22, 2026
Oct 6, 2026
Furnish and install approx. 1,500 SF of 4" thick, 4,000 PSI concrete slab reinforced with fiber mesh and 6x6 welded wire mesh. Provide a smooth trowel finish, control joints, and proper curing. Include all labor, materials, equipment, forming, placement, finishing, and cleanup necessary for a complete installation.
Decision makers connected to this RFP from Catoosa County.