Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Culvert replacements. Contractor to cut the pavement, excavate, and remove and dispose of existing 48" steel culvert. The Town will supply the culvert package which will be 2-3 20-foot sections of dual wall HDPE culverts and applicable supplies in either 24" or 60" diameter, depending on the selected proposal. Contractor to put 3/4" gravel around new culverts and compact every 6". Contractor to re-use old rock and gravel pulled from site area as appropriate. Contractor to haul in gravel as needed to repair road, to include compacting as needed. The contractor shall set the proper culvert elevation to accommodate water flow at the site. Both the inlet and outlet banks shall be lined with rip rap. The Contractor is responsible for any damning and dewatering necessary to complete repairs to the site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Culvert replacements.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Culvert replacements.
AvailableCulvert replacements & rehabilitations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Culvert replacements & rehabilitations.
AvailableRemove existing 7'-4" x 5'-6" CMP Elliptical culvert and replace with a new 10'-6" x 5'-7" Bottomless Aluminum Box Culvert complete with aluminum footing plates, lean concrete sub-footers and aluminum structural plate endwalls.
Posted Date
Dec 3, 2025
Due Date
Jan 16, 2026
Release: Dec 3, 2025
Close: Jan 16, 2026
Remove existing 7'-4" x 5'-6" CMP Elliptical culvert and replace with a new 10'-6" x 5'-7" Bottomless Aluminum Box Culvert complete with aluminum footing plates, lean concrete sub-footers and aluminum structural plate endwalls.
AvailableRoad culvert replacement.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Road culvert replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis