Summary
Implement flood mitigation measures at multiple building. The objective of this project is to mitigate water infiltration into building interiors during heavy rain events that result in localized flooding. He contractor shall: perform all necessary mobilization and site protection, including temporary barriers, drainage controls, pedestrian protection, and related site safety measures; perform hazardous materials abatement, including removal and disposal of asbestos-containing materials (ACM); perform demolition work, including removal of existing site elements, paving, and other materials as required to facilitate regrading, drainage improvements, and installation of new systems. See attached files.