Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 250 LF conduit excavation and backfill including surface restoration; 24 CW (pvms) standard size - full matrix (led) no optional equipment specified, no cellular communications required; 13 CY pole excavation and concrete foundation; 125 LF conduit, metal steel, zinc coated, 1"; 190 LF conduit, metal steel, zinc coated, 3"; 376 LF signal cable 5 conductors, 14 awg; 165 LF electrical service cable 2 wire 6 gauge ; 1049 LF white epoxy reflectorized pavement stripes - 20 mil; 528 lf yellow epoxy reflectorized pavement stripes - 20 mil.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This is an intersection improvement project/contract consists of 0.223 miles of clearing & grubbing, grading, roadway widening, sidewalk, curb & gutter, asphalt paving, striping, traffic signals, and its installation. Work includes: 2,500 CY Earthwork; 570 SY Concrete Flat Work; 280 TN Asphalt; 950 LF Curb & Gutter; 20 LF Storm Drain Pipe.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
This is an intersection improvement project/contract consists of 0.223 miles of clearing & grubbing, grading, roadway widening, sidewalk, curb & gutter, asphalt paving, striping, traffic signals, and its installation. Work includes: 2,500 CY Earthwork; 570 SY Concrete Flat Work; 280 TN Asphalt; 950 LF Curb & Gutter; 20 LF Storm Drain Pipe.
AvailableWork includes approx 2,500 CY earthwork; 1,583 TN asphalt; 1,424 LF curb and gutter; 980 LF storm drain pipe; 146 LF of retaining wall (type p).
Posted Date
Jan 21, 2026
Due Date
Feb 20, 2026
Release: Jan 21, 2026
Close: Feb 20, 2026
Work includes approx 2,500 CY earthwork; 1,583 TN asphalt; 1,424 LF curb and gutter; 980 LF storm drain pipe; 146 LF of retaining wall (type p).
AvailableThis RFP is for professional engineering design services for an intersection improvement project at Winn Road and South Paulding High School.
Posted Date
-
Due Date
Feb 13, 2026
Close: Feb 13, 2026
This RFP is for professional engineering design services for an intersection improvement project at Winn Road and South Paulding High School.
AvailableRoad improvement project.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Road improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis