Closed

Clinchfield Collection System Rehabilitation/Replacement – Contract 2 – Pump Station (SRP-WARP-0156-2)

Description: Replace existing sewerage pumps that will restore the pump station to its original 450 gpm at a minimally increased total dynamic head (cause by higher friction within the older forcemain); install new submersible pumps in the pump station equalization tank and controls to pump wastewater back from the ps equalization basin to the wet well. 1 LS mobilization; 2 EA install fairbanks 4" 5444 or approved equivalent sewage pump; 2 EA install 75hp 3-phase 480v motor; 10 LF 4" ductile iron sewage pipe & connections; 10 LF 6" ductile iron sewage pipe & connections; 2 EA 4" check valve; 5,000 sf pump room painting and surface restoration; 2 EA install hydromatic 1.25" hpg-200 grinder pump; 1 LS transfer piping and fittings; 1 LS electrical equipment and hardware; 1 LS mechanical heating and cool equipment and hardware. See attached file.

Buyer
City of Marion

City · NC, US

Released
Jan 13, 2025
Closes
Mar 19, 2025(Closed)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts