Logo

starbridge

Book a Demo
RFPs/Clinchfield Collection System Rehabilitation/Replacement – Contract 2 – Pump Station (SRP-WARP-0156-2)

Clinchfield Collection System Rehabilitation/Replacement – Contract 2 – Pump Station (SRP-WARP-0156-2)

City of Marion

Summary

Replace existing sewerage pumps that will restore the pump station to its original 450 gpm at a minimally increased total dynamic head (cause by higher friction within the older forcemain); install new submersible pumps in the pump station equalization tank and controls to pump wastewater back from the PS equalization basin to the wet well.

Files

No files

Details

Release

Jan 13, 2025

Close

Feb 12, 2025

Contacts

Source