CityFL
Posted
Nov 5, 2026
Dec 17, 2026
2026.16 Effluent Discharge System Pipeline - Pump Station - Sprayfield 2 Contract 2, 3 and 4 RFP
The project encompasses the construction and installation of an effluent discharge system divided across three contracts. Work includes installing approximately 35,430 LF of 20" SDR 26 PVC pressure pipe, gate valves, air relief valves, tees, and associated fittings to connect system flow. Additionally, the project involves constructing a triplex pumping station housed within a pre-cast fabricated concrete building, a 7.5 million gallon wet-lined wet-weather storage pond, a splitter box, yard piping, site fencing, electrical conduit/wiring, manual/automatic transfer switches, and a natural gas engine-driven generator set. Site improvements include sprayfield piping, valve and sprinkler assemblies, earth moving, dewatering, trenching, structural steel framing, and anti-microbial crystalline concrete admixtures to establish a fully operational municipal effluent discharge system.