City of Marion
Replace existing sewerage pumps that will restore the pump station to its original 450 gpm at a minimally increased total dynamic head (cause by higher friction within the older forcemain); install new submersible pumps in the pump station equalization tank and controls to pump wastewater back from the PS equalization basin to the wet well.
Release
Jan 13, 2025
Close
Feb 12, 2025