CityMA
Posted
May 27, 2026
Sep 29, 2026
Dishwasher Replacement Project *REBID*
The work under this contract shall include Dishwasher replacement and related scope for nine different schools in the City.
Description: Work includes installation and restoration associated with new river outfall and 4" forcemain, lift station, valve vault, associated walkways and lighting associated with the existing wastewater treatment facility.
City · MO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
Posted
May 27, 2026
Sep 29, 2026
The work under this contract shall include Dishwasher replacement and related scope for nine different schools in the City.
CountyOK
Posted
Jun 19, 2026
Sep 14, 2026
Install 3" type b asphalt and seal. Hollie Chapel Dr. 2416 in length, 5,253 SY & 400 Cul-De-Sac SY. Eric Lane 1393 in length, 2,870 SY & 400 Cul-De-Sac SY. Myrtle Ave. 2118 in length, 4121 Roadway SY. Rollingwood Dr 1567 in length, 2869 Roadway SY, & 400 Cul-De-Sac SY. Lakewood Dr 2173 in length, 4476 Roadway SY, & 800 Cul-De-Sac SY. Homestead Dr 233 in length, 427 Roadway SY, & 400 Cul-De-Sac SY. Holly Hills Dr 1955 in length, 4251 Roadway SY. Holly Ct 225 in length, 412 Roadway SY. Meadow Hill Ct 775 in length, 1597 Roadway Square Yards. Rockbrook Dr 615 in length, 1,267 Roadway SY, & 400 Cul-De-Sac SY.
Central Massachusetts Regional Planning Commission (CMRPC)
Special DistrictMA
Posted
Jul 2, 2026
Sep 3, 2026
Project includes the installation of approx. 560 LF of 8" ductile iron water main and associated services, 240 LF of 8" PVC drain line, two precast concrete drainage structures, 2,750 SF of cement concrete sidewalk, 590 linear feet of monolithic concrete curb and 440 LF of hot mix asphalt curb, 1,310 SY of road reconstruction, 900 SF of segmental block retaining wall, and associated work.
CityIL
Posted
Aug 9, 2026
Sep 14, 2026
Project consists of constructing the removal and replacement of the west plant outfall and associated site restoration.