Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist replacement of 6 12" check valves, 12 12" plug valves, 3 6" motor actuators, 6 clarifier drives, 6 8" plug valves, Modification of existing concrete tunnel, approx. 68 CF of new concrete, approx 24 FT of new 8" DIP and fittings, Aluminum Ladders and 2.5" aluminum grating, miscellaneous wiring, and miscellaneous demolition.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close:
Premium
Access the largest public sector contact database
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableWork includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableThe Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
AvailableThe City of Garland is soliciting sealed bids to rehabilitate the secondary clarifier drive mechanism at the Duck Creek Wastewater Treatment Plant in Sunnyvale, TX. Work includes documenting as-built conditions, providing a Texas-licensed structural engineer–sealed rigging/scaffolding/restraint design, removal and disposal of the existing drive, installation of a city-supplied replacement drive, and post-construction verification over a continuous 48-hour operation period. A mandatory pre-bid meeting and site visit are scheduled for 2025-12-17, questions are due by 2025-12-19, and bids are due 2025-12-30; payment and performance bond requirements apply above stated thresholds.
Posted Date
Dec 8, 2025
Due Date
Dec 30, 2025
Release: Dec 8, 2025
Close: Dec 30, 2025
The City of Garland is soliciting sealed bids to rehabilitate the secondary clarifier drive mechanism at the Duck Creek Wastewater Treatment Plant in Sunnyvale, TX. Work includes documenting as-built conditions, providing a Texas-licensed structural engineer–sealed rigging/scaffolding/restraint design, removal and disposal of the existing drive, installation of a city-supplied replacement drive, and post-construction verification over a continuous 48-hour operation period. A mandatory pre-bid meeting and site visit are scheduled for 2025-12-17, questions are due by 2025-12-19, and bids are due 2025-12-30; payment and performance bond requirements apply above stated thresholds.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis