Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply of settling plate assemblies including stationary and removable settling plates assemblies with required accessories, 8 access ladder with top platform and safety gate, 8 removable baffle floor support.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
One Time Purchase of Clarifier Inner Baffle FRP Supports and Plates for the Steven M. Clouse Water Recycling Center (SMCWRC).
Posted Date
Dec 8, 2025
Due Date
Dec 15, 2025
Release: Dec 8, 2025
Close: Dec 15, 2025
One Time Purchase of Clarifier Inner Baffle FRP Supports and Plates for the Steven M. Clouse Water Recycling Center (SMCWRC).
AvailablePremium
Access the largest public sector contact database
Seeks for primary clarifier improvements - center feed clarifier equipment procurement.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Seeks for primary clarifier improvements - center feed clarifier equipment procurement.
AvailableWork includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableWork includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;