Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide civil engineering and environmental services : consist of completely replacing the existing structure and roadway approaches with a new 2 lane concrete bridge and bridge approaches meeting current design standards. The existing bridge is a one lane simple span structure over newell creek. The superstructure is built of simple span steel girders, with a reinforced concrete deck supported on reinforced concrete seat-type abutments with monolithic wingwalls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide surveying services for the ellis road bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Provide surveying services for the ellis road bridge replacement project.
AvailableThe City of Chico is soliciting bids to remove and replace the Pomona Avenue Bridge over Little Chico Creek, including construction of a new cast-in-place concrete bridge, replacement of an existing sewer siphon, drainage improvements, pavement, curb/gutter/sidewalk, retaining walls, and signing/striping. The Engineer's Estimate is approximately $4.8 million and the project is funded with Federal Highway Bridge Program funds. A virtual non-mandatory pre-bid outreach meeting is scheduled for 2025-12-17; bids are required to include a bid security equal to at least 10% of the total bid.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
The City of Chico is soliciting bids to remove and replace the Pomona Avenue Bridge over Little Chico Creek, including construction of a new cast-in-place concrete bridge, replacement of an existing sewer siphon, drainage improvements, pavement, curb/gutter/sidewalk, retaining walls, and signing/striping. The Engineer's Estimate is approximately $4.8 million and the project is funded with Federal Highway Bridge Program funds. A virtual non-mandatory pre-bid outreach meeting is scheduled for 2025-12-17; bids are required to include a bid security equal to at least 10% of the total bid.
Providing professional design and construction engineering services for shawnee county bridge replacement project.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Providing professional design and construction engineering services for shawnee county bridge replacement project.
AvailableSeeking proposals for as needed professional civil engineering services.
Posted Date
Nov 10, 2025
Due Date
Jan 15, 2026
Release: Nov 10, 2025
Close: Jan 15, 2026
Seeking proposals for as needed professional civil engineering services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis