CityCA
Aug 27, 2026
Closes
Sep 23, 2026
Citywide Sidewalk Repair Program (Hawthorne Boulevard), I-152 RFP
The City of Torrance is soliciting electronic bids for the Citywide Sidewalk Repair Program along a five-mile stretch of Hawthorne Boulevard between Redondo Beach Boulevard and Pacific Coast Highway. The work includes replacing damaged sidewalks, driveways, curbs, and gutters; upgrading curb ramps; and trimming, pruning, or replacing parkway trees and roots affecting sidewalks. This is a lump-sum construction bid with a 60-working-day project duration, and bids are due September 23, 2026, at 3:00 PM PDT.