Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Panama City Beach
Renovation of wooden side rails at the city pier. Replacement of all sections of worn and aged wooden side rail panels on the fields pier. There are approximately 220 panels. Furnish labor and materials to replace wooden side rail panels on the pier. Furnish and install 2βx8βx14β top rail using composite board in the color - Cape Cod Grey. Furnish and install 2βx6βx14β pressure treated wood side boards at top and bottom. Furnish and install 2βx2βx37.5β square spindles. Furnish and install Β½β concrete anchors where spindles attach to concrete or Β½β lag bolts to 6βx6β wood posts. 3 anchors per attachment point. Furnish and install 6βx6βx66β pressure treated square wooden posts. Furnish and install ΒΎβ x6β concrete anchors to secure posts to concrete pier. 3 anchors per post. All hardware must be stainless steel. All Β½β, ΒΎβ bolts and lag bolts will have stainless steel washers. All pressure treated wood and or composite material will be secured with decking screws-no nails. Furnish and install Thompson Water Seal (or equivalent) to all wooden components.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Sarasota
Saprito Pier- Hurricane Damage and Recovery. The Tony Saprito Pier (987 John Ringling Causeway) was heavily damaged during the hurricane season in 2024. The City requires a Contractor to perform all services including but not limited to those required to repair, restore, and enhance resiliency for the City's infrastructure.
Posted Date
Oct 22, 2025
Due Date
Dec 3, 2025
Release: Oct 22, 2025
City of Sarasota
Close: Dec 3, 2025
Saprito Pier- Hurricane Damage and Recovery. The Tony Saprito Pier (987 John Ringling Causeway) was heavily damaged during the hurricane season in 2024. The City requires a Contractor to perform all services including but not limited to those required to repair, restore, and enhance resiliency for the City's infrastructure.
AvailablePenticton
The City of Penticton seeks proposals for the replacement of Penticton Pier, including removal of the existing pier, construction of a new pier, and installation of landscaping and lighting. Substantial performance is required by April 30, 2026.
Posted Date
Nov 4, 2025
Due Date
Nov 27, 2025
Release: Nov 4, 2025
Penticton
Close: Nov 27, 2025
The City of Penticton seeks proposals for the replacement of Penticton Pier, including removal of the existing pier, construction of a new pier, and installation of landscaping and lighting. Substantial performance is required by April 30, 2026.
AvailableCity of Holly Hill
To remove and properly dispose of approximately 140 LF of damaged pier sections on piles and submerged in the Halifax River, receive, unload, assemble, and install prefabricated dock sections supplied by pier manufacturer onto the existing concrete pilings, including four (4) fixed piers measuring 8` x 30` each and one (1) fixed pier measuring 8` x 18`, with 2x6 Composite Timber Tech Vintage Decking, 42" Combination Rail system, and ten (10) 9` Header Kits. The Contractor shall shim existing composite decking boards on the remaining pier sections to ensure proper fit, remove and replace five (5) D-Series LED Bollard lights (lights to be provided by the City), including mounting, electrical connections, and testing to ensure full functionality.
Posted Date
Oct 27, 2025
Due Date
Dec 1, 2025
Release: Oct 27, 2025
City of Holly Hill
Close: Dec 1, 2025
To remove and properly dispose of approximately 140 LF of damaged pier sections on piles and submerged in the Halifax River, receive, unload, assemble, and install prefabricated dock sections supplied by pier manufacturer onto the existing concrete pilings, including four (4) fixed piers measuring 8` x 30` each and one (1) fixed pier measuring 8` x 18`, with 2x6 Composite Timber Tech Vintage Decking, 42" Combination Rail system, and ten (10) 9` Header Kits. The Contractor shall shim existing composite decking boards on the remaining pier sections to ensure proper fit, remove and replace five (5) D-Series LED Bollard lights (lights to be provided by the City), including mounting, electrical connections, and testing to ensure full functionality.
City of Santa Barbara
The City of Santa Barbara is seeking bids to refurbish Hoist #2 on the City Pier, including replacement of the winch assembly, control circuits, electrical panel and service disconnect. The selected contractor must provide all materials, equipment, and labor, comply with prevailing wage and insurance requirements, and provide bonds if applicable.
Posted Date
Nov 18, 2025
Due Date
Dec 15, 2025
Release: Nov 18, 2025
City of Santa Barbara
Close: Dec 15, 2025
The City of Santa Barbara is seeking bids to refurbish Hoist #2 on the City Pier, including replacement of the winch assembly, control circuits, electrical panel and service disconnect. The selected contractor must provide all materials, equipment, and labor, comply with prevailing wage and insurance requirements, and provide bonds if applicable.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis