Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes appox 18 LF of 30" RCP storm sewer; 863 LF of 6" AWWA C-900 water line, including fittings, restrained joints, and appurtenances by open cut; 237 LF of 8" AWWA C-900 water line with integral bell restrained joints by trenchless construction (horizontal directional boring). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
Premium
Access the largest public sector contact database
Work includes installation of approx 2,270 LF of 8" water line and 1,130 LF of 6" to replace the existing water line, installation of valves hydrants and all appurtenances and the abandonment of the existing water lines.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Work includes installation of approx 2,270 LF of 8" water line and 1,130 LF of 6" to replace the existing water line, installation of valves hydrants and all appurtenances and the abandonment of the existing water lines.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis