Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx 2,270 LF of 8" water line and 1,130 LF of 6" to replace the existing water line, installation of valves hydrants and all appurtenances and the abandonment of the existing water lines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project will consist, but is not limited to, boring a 12" steel casing under an existing railroad crossing and installing a 6" water line, including all connections to existing, valves, markers, casing vents, traffic control, storm water pollution prevention, and abandonment of existing pipe
Posted Date
Nov 16, 2025
Due Date
Dec 17, 2025
Release: Nov 16, 2025
Close: Dec 17, 2025
Project will consist, but is not limited to, boring a 12" steel casing under an existing railroad crossing and installing a 6" water line, including all connections to existing, valves, markers, casing vents, traffic control, storm water pollution prevention, and abandonment of existing pipe
Premium
Access the largest public sector contact database
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Work includes approx. 2,463 LF of 1" Dia. HDPE DR 11 Pipe, Including All HDD, 533 LF of 1.5" Dia. HDPE DR 11 Pipe, Including All HDD, Excavation; 338 LF of 2" Dia. HDPE DR 11 Pipe, Including All HDD; 131 LF of 2.5" Dia. HDPE DR 11 Pipe; 28 LF of 4" Dia. HDPE DR 11 Pipe, Including All HDD. See outside link.
AvailableRelease: Nov 13, 2025
Close: Dec 15, 2025
Sewer, Water & Street Improvements.
AvailableWork includes approx. 217 LF of jack and bore roadway crossing with 26" casing, complete excluding carrier pipe; 289 LF of jack and bore railroad crossing with 26" casing, complete excluding carrier pipe; 2,540 LF of 16" ductile iron slip joint pipe, class 250, for waterline replacement; 1,120 LF ductile iron slip joint pipe, class 250, for waterline replacement; 500 SY of concrete pavement replacement for open cut; 580 SY of asphalt pavement replacement for open cut; 500 LF of silt fence; 200 LF of wattle installation and removal; see outside link for more details.
Posted Date
Nov 15, 2025
Due Date
Jan 15, 2026
Release: Nov 15, 2025
Close: Jan 15, 2026
Work includes approx. 217 LF of jack and bore roadway crossing with 26" casing, complete excluding carrier pipe; 289 LF of jack and bore railroad crossing with 26" casing, complete excluding carrier pipe; 2,540 LF of 16" ductile iron slip joint pipe, class 250, for waterline replacement; 1,120 LF ductile iron slip joint pipe, class 250, for waterline replacement; 500 SY of concrete pavement replacement for open cut; 580 SY of asphalt pavement replacement for open cut; 500 LF of silt fence; 200 LF of wattle installation and removal; see outside link for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis