Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of West Columbia is requesting bids for repair of the West Columbia Riverwalk using a design-build project delivery method. Bid documents and addenda are available at the original bid source (SCBO) linked from the listing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of construction services for Riverwalk channel improvements, including the construction of sidewalks, steps, ramps, retaining walls, and handrails.
Posted Date
Dec 3, 2025
Due Date
Jan 27, 2026
Release: Dec 3, 2025
Close: Jan 27, 2026
Procurement of construction services for Riverwalk channel improvements, including the construction of sidewalks, steps, ramps, retaining walls, and handrails.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repair of the west passenger elevator.
Posted Date
Dec 5, 2025
Due Date
Jan 12, 2026
Release: Dec 5, 2025
Close: Jan 12, 2026
Repair of the west passenger elevator.
AvailableRequest for professional design and engineering services for pedestrian walkway and bulkhead reinforcement along the Savannah River.
Posted Date
Jan 7, 2026
Due Date
Feb 26, 2026
Release: Jan 7, 2026
Close: Feb 26, 2026
Request for professional design and engineering services for pedestrian walkway and bulkhead reinforcement along the Savannah River.
AvailableComplete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
Posted Date
Apr 10, 2025
Due Date
Jan 19, 2026
Release: Apr 10, 2025
Close: Jan 19, 2026
Complete repair of the west breakwater. The work consists of replacing displaced armor stone and resetting existing stone to interlock with the new stone. Approx. 45,000 CY of sediment will be dredged for access to the breakwater.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →