Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide elevated storage tank rehabilitation. Work includes - interior and exterior painting of existing 50,000 gallon multi legged elevated storage tank and 106,000 gallon standpipe. Temporary containment systems. Temporary bypass pressure relief piping. 1 LS abrasive blast, minor repairs, furnish & install 2.5 to 3.5 dry mils prime coat tank interior, $ collection, hauling, disposal existing coating & sand; 1 LS furnish & install stripe coat on tank interior weld seams; 1 LS furnish & install 15.0 to 18.0 dry mils finish coat on tank interior; 1 LS disinfect & test tank interior; 1 LS provide containment system; 1 LS abrasive blast, minor repairs, furnish & install 2.5 to 3.5 dry mils prime coat tank exterior. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work includes surface preparation, corrosion repair, and coating of metal surfaces of the City of Cocoa 1.5 MG Elevated Water Storage Tank. The Contractor scope of work also includes rehabilitation of tank equipment such as vents, ladders, and structural supports
Posted Date
Nov 10, 2025
Due Date
Dec 19, 2025
Release: Nov 10, 2025
Close: Dec 19, 2025
The work includes surface preparation, corrosion repair, and coating of metal surfaces of the City of Cocoa 1.5 MG Elevated Water Storage Tank. The Contractor scope of work also includes rehabilitation of tank equipment such as vents, ladders, and structural supports
AvailableThe City of Sugar Land seeks bids to rehabilitate an elevated storage tank, including blasting and recoating the tank interior and exterior, replacing valves, adding a recirculating pump with electrical and SCADA integration, and performing associated piping, concrete, and site improvements. A non‑mandatory pre‑bid meeting and site visit are scheduled, and bids are due electronically by 11:00 AM CT on December 18, 2025.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
The City of Sugar Land seeks bids to rehabilitate an elevated storage tank, including blasting and recoating the tank interior and exterior, replacing valves, adding a recirculating pump with electrical and SCADA integration, and performing associated piping, concrete, and site improvements. A non‑mandatory pre‑bid meeting and site visit are scheduled, and bids are due electronically by 11:00 AM CT on December 18, 2025.
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailableProject includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Project includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis