Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Port Jervis is soliciting bids to furnish materials and equipment for gravity sand filters, including supply, start-up, commissioning performance testing, and operator training as part of its Water Filter Plant Rehabilitation project. The solicitation is an Invitation for Bid (Solicitation ID 938PW123-24 / NYSCR ID 2130177), posted 2025-12-31 and open through 2026-01-23. Bid documents are hosted on the New York State Contract Reporter and require account sign-in to download; no publicly accessible primary bid document was found.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Work consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableThis project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
Posted Date
Nov 21, 2025
Due Date
Feb 4, 2026
Release: Nov 21, 2025
Close: Feb 4, 2026
This project includes rehabilitation of three (3) filters including removal of underdrains, media, and surface sweeps and replacement with stainless steel underdrains, new media and surface sweeps. This project also includes the rehabilitation of a section of the roof over the three filters.
AvailableFilter rehabilitation draper water treatment plant. Rehabilitation of filter nos. 6, 7, 8, and 16. Demolition/removal and off-site disposal of existing filter media, underdrain systems, troughs, and select instrumentation. Selective demolition of air piping and associated supports. Procurement, installation, testing, disinfection, and commissioning of new underdrain system, filter media, media retention caps, and selected trough bid alternate. Concrete repairs. Air piping repairs. Filter instrumentation - all 18 filters. Backwash flow and pressure control improvements.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Close: Jan 14, 2026
Filter rehabilitation draper water treatment plant. Rehabilitation of filter nos. 6, 7, 8, and 16. Demolition/removal and off-site disposal of existing filter media, underdrain systems, troughs, and select instrumentation. Selective demolition of air piping and associated supports. Procurement, installation, testing, disinfection, and commissioning of new underdrain system, filter media, media retention caps, and selected trough bid alternate. Concrete repairs. Air piping repairs. Filter instrumentation - all 18 filters. Backwash flow and pressure control improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis