Staggers Road Improvements Project
Construction and repair of concrete curb and gutter, concrete sidewalk, pedestrian ramps, pedestrian crosswalks, and asphalt repair work and resufracing.
Description: Work includes approx 329 CY excavation; 1,294 SY seeding and mulching; 149 LF of 12" conduit, type e; 102 CY asphalt concrete surface course.
City · OH, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMD
Posted
Jun 30, 2026
Oct 14, 2026
Construction and repair of concrete curb and gutter, concrete sidewalk, pedestrian ramps, pedestrian crosswalks, and asphalt repair work and resufracing.
Posted
Sep 1, 2026
Oct 6, 2026
The project consists of milling, paving, patching, and striping approximately 5660 LF of asphalt pavement along Cedar Grove Road from the city limits near Old Ridge Road to the intersection of Cedar Grove & Cochran Mill Road; and 400 LF of driveway for the Cedar Grove Community Building. Also, the project includes repairs to the asphalt approach to the southernmost bridge (Little Bear Creek) on Cochran Mill Road between Rivertown Road and South Fulton Parkway.
CityAZ
Posted
-
Sep 29, 2026
The City of Chandler is seeking qualified consultants for construction management services related to widening the Ray Road and Dobson Road intersection. The work includes dual left-turn lanes, right-turn lanes, ADA upgrades, bike lanes, sidewalks, curb and gutter, street lighting, traffic signals, storm drainage, landscaping, utilities, irrigation systems, site walls, and related improvements, and is federally funded through FHWA. Submittals are due September 29, 2026, at 3 p.m. Arizona Time.
Posted
Sep 3, 2026
Sep 29, 2026
See for construction management services for road intersection improvements.