Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The installation of approx. 80 SY of concrete pavement. This will connect to a proposed 6' wide concrete drainage flume.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
CDBG chemung street paving and drainage.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
CDBG chemung street paving and drainage.
AvailablePremium
Access the largest public sector contact database
The City of St. Gabriel seeks sealed bids for construction to improve drainage and add sidewalks along Morris Street, including driveway removal/addition, excavation and embankment, installation of sidewalks, drainage pipe and drainage structures, and temporary traffic control. This is a local public works construction project, not a grant, with bids due December 18, 2025.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
The City of St. Gabriel seeks sealed bids for construction to improve drainage and add sidewalks along Morris Street, including driveway removal/addition, excavation and embankment, installation of sidewalks, drainage pipe and drainage structures, and temporary traffic control. This is a local public works construction project, not a grant, with bids due December 18, 2025.
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
AvailableComplete a long-term viability study needed to evaluate the future of the Vine Street Water Treatment Plant (WTP). Study shall include analysis of the existing conditions at the WTP and other water systems as related to plant operations, and a cost benefit analysis comparing options to make improvements on site compared to decommissioning the WTP and constructing a new plant at an alternate site.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Complete a long-term viability study needed to evaluate the future of the Vine Street Water Treatment Plant (WTP). Study shall include analysis of the existing conditions at the WTP and other water systems as related to plant operations, and a cost benefit analysis comparing options to make improvements on site compared to decommissioning the WTP and constructing a new plant at an alternate site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis