CityIL
Aug 26, 2026
Closes
Sep 22, 2026
Ontario Street Drainage Improvements RFP
100 CY earth excavation; 270 SY restoration (topsoil & seed); 300 LF storm sewer, 12" c900 PVC; 30 LF storm sewer, 12" slotted pipe -durapipe with end caps.
Description: Work: clearing and grubbing of approximately 1.50 acres. Removal of storm drain systems (pipes and structures) under both pavement and natural ground. Installation of storm drain system (pipes and structures) along buxton boulevard, sessoms street, wright street, montgomery street and within storm drainage easement west of sessoms street. Project also includes replacement of existing 8 water main located on buxton boulevard, removal of abandoned asbestos cement water main, and sections of water main vertical relocations and water service reconnections. Also included, removal and replacement of gravity sanitary sewer and sewer manholes and sewer lateral reconnections. Removal and replacement of asphalt pavement, curbing, driveways, signage, and landscaping. Right-of-way and private property restoration as necessary during and after construction.
City · NC, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityIL
Aug 26, 2026
Closes
Sep 22, 2026
100 CY earth excavation; 270 SY restoration (topsoil & seed); 300 LF storm sewer, 12" c900 PVC; 30 LF storm sewer, 12" slotted pipe -durapipe with end caps.
CityNE
Aug 25, 2026
Closes
Sep 9, 2026
Construction of approx 800 LF of storm sewer improvements. Work includes pavement removal, grading, storm sewer construction, earth shoulder construction, seeding, erosion control and other incidental work.
CityMO
Aug 10, 2026
Closes
Sep 3, 2026
Asphalt overlay approx. 19,195 SY of asphalt and approx. 1,250 SY of milling.
CityOK
Aug 29, 2026
Closes
Sep 21, 2026
105 LF, 6 LF x 4 LF RCB Culvert (Single Cell); 2 EA, 10 LF x 10 LF Precast Concrete Stormwater Junction Box; 38 SY Asphalt Pavement.
Decision makers connected to this RFP from City of Fayetteville.