Summary
Work consists of street & utility improvement, HMA pavement, base aggregate dense, common excavation, concrete curb and gutter, concrete driveways, concrete sidewalk, sanitary sewer, water main, sanitary services, water services, storm sewer. Work includes 1422 SF of removing concrete sidewalk/driveway; 615 CY of excavation common; 179 TON of HMA pavement 3 lt 58-28 s; 461 LF of concrete curb & gutter 30" type d; 40 LF of concrete curb pedestrian; 16 SF of curb ramp detectable warning field yellow; 44 LF of storm sewer pipe class iii-a 12"; 360 SY of erosion mat urban class 1 type a; 108 LF of sawing asphalt; 158 LF of sanitary sewer main, 8"; 143 LF of televising sanitary sewer; 229 LF of water main, 8"; 8 LF of water main ductile iron, 6"; 50 SF of insulation 2".