Florida Department of Commerce
State AgencyFL
Posted
Nov 6, 2026
Dec 7, 2026
City of Brooksville Downtown Revitalization Construction
RFP-DPW-2026-0010 DOWNTOWN REVITALIZATION CONSTRUCTION SUMMARY OF WORK CITY OF BROOKSVILLE COMMUNITY DEVELOPMENT BLOCK GRANT, FUNDED BY THE FLORIDA DEPARTMENT OF COMMERCE (FDOC) #### CDBG No. 23DB-C01 1. CDBG Community Revitalization The City of Brooksville Downtown Revitalization Project includes various infrastructure improvements throughout the City's Downtown District. The proposed improvements consist of sidewalk repairs and replacements, roadway milling and resurfacing, decorative street lighting, and fire hydrant installations and replacements. All improvements shall be completed in accordance with applicable City of Brooksville standards, project specifications, and federal, state, and local requirements associated with CDBG funding. The scope of work shall include the following: 1. Sidewalk Repairs and Replacements: Removal and replacement of miscellaneous sections of damaged or deteriorated concrete sidewalks throughout the Downtown District, as identified on the project map. Improvements shall include necessary grading, ADA compliance, and restoration of disturbed rights-of-way. 2. Roadway Milling, Resurfacing, and Striping: Milling and resurfacing of North Main Street, extending from Fort Dade Avenue to Russell Street (approximately 2,400 LF). Improvements shall include necessary pavement preparation, asphalt overlay, installation of FDOT-compliant thermoplastic pavement markings, including lane striping, centerlines, stop bars, crosswalks, and directional markings, as applicable, and restoration of disturbed rights-of-way. 3. Decorative Street Lighting: Installation of fifteen (15) decorative streetlights throughout the Downtown District at designated locations. Duke Energy will be responsible for the installation of Streetlights. The selected contractor shall coordinate with Duke Energy and the City of Brooksville as necessary to accommodate the installations and associated construction activities. 4. Fire Hydrant Installations and Replacements: Replacement of existing fire hydrants and installation of new fire hydrants at designated locations throughout the Downtown District, as identified on the project map. Work shall include necessary connections to the existing water distribution system, associated piping and fittings, testing, and restoration of disturbed areas.
