Summary
Work includes storm drain replacement and resurfacing. A failing section of vitrified clay lines will be replaced by 12" HDPE mainedot option iii dual wall pipe with a smooth interior. All existing structures will need to be connected into this new storm drain line. A doghouse manhole structure will be installed to make the connection between the new line and the existing concrete storm drain. After the storm drain replacement is complete, the remaining portions of this section of roadway will be milled and overlaid and the sidewalk will be reconstructed. All new concrete curbing will be installed as part of the reconstruction. Two different curb molds will be utilized.