Summary
The project consists generally of the following items in accordance with the drawings and specifications presented in this Project Manual: The Back Cove Stairs Project includes all labor and materials associated with stone stairs removal and replacements. Work will include, but is not limited to, the following: Provide and maintain construction signage, erosion control, and temporary barriers; Remove and dispose of Ashlar stone-and-mortar sets of stairs located at the east ends of Mackworth and Chenery Streets connecting to Baxter Boulevard; Construct stairs at Mackworth and Chenery Streets, substituting granite for Ashlar stone-and-mortar. Work includes aggregate base, geotextiles, reinforcement geogrid, and setting beds; Provide and install continuous metal handrails and posts (one side of each stairway); Repair portions of the brick walkway disturbed by construction activities (Chenery Street); This work shall be incidental to the site work and shall consist of preparing aggregate base, setting bed, resetting bricks, and adjusting existing edging, as required; Reconstruct the approx. 7-foot long, 5-foot wide (9 square yards) stone dust path at the top of Mackworth Street.