Summary
The City of Bradfordsville is seeking bids for I&I (Inflow & Infiltration) Rehabilitation - Phase 2 of its wastewater collection system improvements. The project includes approximately 700 LF of new 8-inch gravity sewer, 1,225 LF of new 10-inch gravity sewer, 11 new 4-foot diameter manholes, 1,200 LF of 8-inch CIPP sewer rehabilitation, 10 manholes to be rehabilitated, 25 sewer service lateral reinstatements, 11 point repairs, demolition of 7 existing manholes, and 1,900 LF of drain/cap/abandon existing sewer. The project is funded in part through the Kentucky Infrastructure Authority (KIA) and administered by Kenvirons as the project engineer.