Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Bradfordsville
The City of Bradfordsville is seeking bids for I&I (Inflow & Infiltration) Rehabilitation - Phase 2 of its wastewater collection system improvements. The project includes approximately 700 LF of new 8-inch gravity sewer, 1,225 LF of new 10-inch gravity sewer, 11 new 4-foot diameter manholes, 1,200 LF of 8-inch CIPP sewer rehabilitation, 10 manholes to be rehabilitated, 25 sewer service lateral reinstatements, 11 point repairs, demolition of 7 existing manholes, and 1,900 LF of drain/cap/abandon existing sewer. The project is funded in part through the Kentucky Infrastructure Authority (KIA) and administered by Kenvirons as the project engineer.
Posted Date
-
Due Date
Aug 4, 2026
City of Bradfordsville
Close: Aug 4, 2026
The City of Bradfordsville is seeking bids for I&I (Inflow & Infiltration) Rehabilitation - Phase 2 of its wastewater collection system improvements. The project includes approximately 700 LF of new 8-inch gravity sewer, 1,225 LF of new 10-inch gravity sewer, 11 new 4-foot diameter manholes, 1,200 LF of 8-inch CIPP sewer rehabilitation, 10 manholes to be rehabilitated, 25 sewer service lateral reinstatements, 11 point repairs, demolition of 7 existing manholes, and 1,900 LF of drain/cap/abandon existing sewer. The project is funded in part through the Kentucky Infrastructure Authority (KIA) and administered by Kenvirons as the project engineer.
AvailableCity of Bradfordsville
This contract consists of installing approx 450 LF of 24" HDPE Storm Sewer, 35 LF of 18" HDPE Storm Sewer, 16 LF of 12" HDPE Storm Sewer, and all other necessary appurtenances including 8 associated drop boxes and 1 headwall. Also included in the project is the removal and replacement of roughly 340 SY of concrete sidewalk and the construction of 77 LF of concrete paved ditch.
Posted Date
Feb 13, 2025
Due Date
Aug 20, 2025
Release: Feb 13, 2025
City of Bradfordsville
Close: Aug 20, 2025
This contract consists of installing approx 450 LF of 24" HDPE Storm Sewer, 35 LF of 18" HDPE Storm Sewer, 16 LF of 12" HDPE Storm Sewer, and all other necessary appurtenances including 8 associated drop boxes and 1 headwall. Also included in the project is the removal and replacement of roughly 340 SY of concrete sidewalk and the construction of 77 LF of concrete paved ditch.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge