Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the construction of a new 12” storm sewer outfall pipe. The improvement efforts include clearing and grubbing of the project area, storm sewer manhole removal/replacement, abandonment of existing storm sewer conduit, sinkhole restoration, construction of a new half-height headwall and restoration of the adjacent construction area.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Upgrade the stormwater collection and conveyance system in a coastal urban area. This project is one part of a larger effort of similar projects by the city to upgrade stormwater infrastructure along the coast and direct runoff to outfall offshore in a deep spot underwater and away from the beach. This will allow the city to remove hazardous and unappealing concrete pipes that are exposed on the beach.
Posted Date
Aug 20, 2025
Due Date
Jan 6, 2026
Release: Aug 20, 2025
Close: Jan 6, 2026
Upgrade the stormwater collection and conveyance system in a coastal urban area. This project is one part of a larger effort of similar projects by the city to upgrade stormwater infrastructure along the coast and direct runoff to outfall offshore in a deep spot underwater and away from the beach. This will allow the city to remove hazardous and unappealing concrete pipes that are exposed on the beach.
Premium
Access the largest public sector contact database
Yuba City is soliciting contractors to pressure test the wastewater outfall pressure pipe and clean valve vaults as necessary. The solicitation is posted through the City’s PublicPurchase portal and has an estimated value range of $50,000 - $200,000.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
Yuba City is soliciting contractors to pressure test the wastewater outfall pressure pipe and clean valve vaults as necessary. The solicitation is posted through the City’s PublicPurchase portal and has an estimated value range of $50,000 - $200,000.
AvailableWorks include heavy vegetation removal in and around outfall ditches and roadside ditches.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Works include heavy vegetation removal in and around outfall ditches and roadside ditches.
AvailableProject scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis