CityMI
Posted
Oct 22, 2026
Nov 18, 2026
Warren City Hall Stand-By Generator RFP
The scope of the project includes the replacement of the existing backup power generator. Due to current building needs, a larger generator is required to provide adequate backup power during outage events and emergency situations. Associated construction includes pavement removals of the existing generator pad and surrounding concrete sidewalk, concrete paving for the new generator pad and site electrical to connect and energize the replacement generator.
