Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Westlake Village seeks bids to renovate restrooms at City Hall, including demolition of existing fixtures, ceiling modifications, substrate preparation, installation of city-furnished tile, quartz countertops, fixtures, and painting. Bidders must hold a valid Class B General Building contractor license and comply with California DIR registration requirements; the project is a construction bid with an estimated value between $100,000 and $500,000. The contract work begins upon award with an expected 20 working day duration and the solicitation is open as of 2026-01-24.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demo and remove all existing restroom components to bare walls/ceiling before the commencement of new construction. Install all new plumbing and any new electrical wiring as necessary. Install new exhaust ventilation in both bathrooms, including controls, ductwork, and roof. Insulate the interior walls in both restrooms before the installation of new sheetrock. Install all new ada equipment: white handicapped toilet, white sink with lever-style hardware, a 36" grab bar, a 42" grab bar, mirror, towel dispenser, soap dispenser, and a toilet paper dispenser, insulate under-sink piping, a coat hook, an ada-compliant threshold, new door with lever-style hardware in all restrooms. See outside link.
Posted Date
Oct 17, 2025
Due Date
Feb 12, 2026
Release: Oct 17, 2025
Close: Feb 12, 2026
Demo and remove all existing restroom components to bare walls/ceiling before the commencement of new construction. Install all new plumbing and any new electrical wiring as necessary. Install new exhaust ventilation in both bathrooms, including controls, ductwork, and roof. Insulate the interior walls in both restrooms before the installation of new sheetrock. Install all new ada equipment: white handicapped toilet, white sink with lever-style hardware, a 36" grab bar, a 42" grab bar, mirror, towel dispenser, soap dispenser, and a toilet paper dispenser, insulate under-sink piping, a coat hook, an ada-compliant threshold, new door with lever-style hardware in all restrooms. See outside link.
AvailableThis RFP is for the procurement of construction services for the Pascagoula City Hall Improvements Project.
Posted Date
Dec 28, 2025
Due Date
Jan 27, 2026
Release: Dec 28, 2025
Close: Jan 27, 2026
This RFP is for the procurement of construction services for the Pascagoula City Hall Improvements Project.
AvailableRenovation of the existing restrooms on all three floors of mike hughes hall (vcu brandcenter), including selective demolition work as required. On levels 1 and 2, the traditional men's/women's restroom layouts will largely remain intact, whereas on the basement level, the traditional men s women s restroom layouts will be fully reconfigured in order to accommodate all-gender restrooms.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
Renovation of the existing restrooms on all three floors of mike hughes hall (vcu brandcenter), including selective demolition work as required. On levels 1 and 2, the traditional men's/women's restroom layouts will largely remain intact, whereas on the basement level, the traditional men s women s restroom layouts will be fully reconfigured in order to accommodate all-gender restrooms.
2026 City Hall Retaining Wall Project.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
2026 City Hall Retaining Wall Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis