Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct approx 900LF of 6" thick sidewalk (10-12' width), 252 LF of 1'-1.5' tall cast in place concrete type C-1 curb edge and 614 LF of safety handrailing, 2,007 SY of 5" reinforced concrete slope paving and relocation of 153 SY of 18" RIPRAP in existing Drainage Ditch.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project will upgrade a portion of the existing drainage system. There will be approx. 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new ez-block retaining wall will be constructed to support the existing failing stone wall on street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. See outside link.
Posted Date
Nov 14, 2025
Due Date
Jan 14, 2026
Release: Nov 14, 2025
Close: Jan 14, 2026
This project will upgrade a portion of the existing drainage system. There will be approx. 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new ez-block retaining wall will be constructed to support the existing failing stone wall on street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. See outside link.
AvailableDesign/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailableWork includes boulevard rehabilitation includes installation of sidewalk, signage, striping, drainage improvements, and other necessary work.
Posted Date
Dec 11, 2025
Due Date
Jan 26, 2026
Release: Dec 11, 2025
Close: Jan 26, 2026
Work includes boulevard rehabilitation includes installation of sidewalk, signage, striping, drainage improvements, and other necessary work.
AvailableCrossing guard services.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Crossing guard services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis