Rehabilitation of 15" Gravity Sewer Main Along Porter Lane RFP
Work includes the rehabilitation of approx 3,550 feet of 15" gravity sewer main and manholes located along porter lane.
Description: Construction of South Lake to South Fork wastewater improvements, including force main and gravity sewer pipelines, manholes, and appurtenances.
City · TX, US
Adjacent opportunities open for bidding right now.
CityLA
Posted
Nov 6, 2026
Dec 9, 2026
Work includes the rehabilitation of approx 3,550 feet of 15" gravity sewer main and manholes located along porter lane.
CityGA
Posted
-
Dec 2, 2026
Work includes 480 LF 8" pvc gravity sewer, astm d3034, sdr 26 (0' - 6' deep); 15 LF 8" pvc gravity sewer, astm d3034, sdr 26 (6' - 8' deep); 2 EA 4' i. D. Manhole (0' - 6' deep); 1 EA 4' ID. manhole (6' - 8' deep); 1 ea connect to existing 8" dia. Sewer main with 4'id saddle manhole (0' - 6' deep); 1 EA connect to existing 8" dia. Sewer main with 4' id saddle manhole (6' - 8' deep); 480 LF abandon existing 8" sewer main in place and fill completely with flowable fill. Plug ends with brick and mortar plugs. See attached file.
CityGA
Posted
-
Dec 2, 2026
Work includes 175 LF 8" PVC gravity sewer, astm d3034, sdr 26 (0' - 6' deep); 175 LF remove existing gravity sewer; 2 EA connect proposed 8" dia. Sewer to existing manhole and install flexible boot connector; 444 SY mill and overlay existing pavement with asphaltic concrete; 200 CY sand backfill; 200 cy stone bedding; 140 LF 8" pvc gravity sewer, astm d3034, sdr 26 (6' - 8' deep); 95 LF 8" pvc gravity sewer, astm d3034, sdr 26 (8' - 10' deep); 122 LF 8" pvc gravity sewer, astm d3034, sdr 26 (10' - 12' deep); 2 EA connect proposed 8" dia. Sewer to existing manhole and install flexible boot connector.
Special DistrictTX
Posted
-
Nov 19, 2026
Scope of work of the contract includes: utility improvements: installation of approx. 2,750 LF of 12" gravity sanitary sewer including manholes and encasement. Earthwork improvements: installation of approx. 5,900 SY of flex base access road to a future proposed wastewater treatment plant (not proposed in this bid) including culvert installation and approx. 5,520 CY of excavation. 1,809 LF 12" sdr-35 pvc pipe ; 1 EA standard 5' diameter manhole w/ odor control unit per plans (includes connection to existing force main) ; 65 VF extra vertical depth on 4' diameter manhole; 15 EA manhole vacuum testing. See attached file.