Montgomery Farms Off-Site Gravity Main RFP
Posted
-
Nov 19, 2026
Scope of work of the contract includes: utility improvements: installation of approx. 2,750 LF of 12" gravity sanitary sewer including manholes and encasement. Earthwork improvements: installation of approx. 5,900 SY of flex base access road to a future proposed wastewater treatment plant (not proposed in this bid) including culvert installation and approx. 5,520 CY of excavation. 1,809 LF 12" sdr-35 pvc pipe ; 1 EA standard 5' diameter manhole w/ odor control unit per plans (includes connection to existing force main) ; 65 VF extra vertical depth on 4' diameter manhole; 15 EA manhole vacuum testing. See attached file.



