Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of replacement of four (4) existing (6") Chlorine Contact Tank drain valves at the PCP Facility. Two (2) of the existing valves are currently inoperable and all four valves are critical to the normal operation and maintenance of the Chlorine Contact Tanks. 4 EA Sanitary sewer gate or plug valve, 6" including excavation, removal of existing valve, installation, backfill, and restoration, up to 16' deep; 1 LS Concrete removal, excavation, and concrete replacement/restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes waterline valve replacement.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes waterline valve replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes remove 5 existing 16 pump control valves; existing valves are a combination of singer and bailey valves; remove 1 existing size 8 altitude valve; existing altitude valve is bailey; properly dispose of all debris off-site in accordance with local regulations; valves must be installed as they are removed; once one valve is removed, one valve is to be installed to limit the amount of operational impact; install 5 new identical pump control valves; other comparable valves may be accepted but cla-val 60-bt with high capacity csm 11 h-c is preferred; install 1 new replacement altitude valve. Installation must be done the same day as removal and must be coordinated 2 weeks in advance. See attached file.
Posted Date
Dec 31, 2025
Due Date
Feb 5, 2026
Release: Dec 31, 2025
Close: Feb 5, 2026
Work includes remove 5 existing 16 pump control valves; existing valves are a combination of singer and bailey valves; remove 1 existing size 8 altitude valve; existing altitude valve is bailey; properly dispose of all debris off-site in accordance with local regulations; valves must be installed as they are removed; once one valve is removed, one valve is to be installed to limit the amount of operational impact; install 5 new identical pump control valves; other comparable valves may be accepted but cla-val 60-bt with high capacity csm 11 h-c is preferred; install 1 new replacement altitude valve. Installation must be done the same day as removal and must be coordinated 2 weeks in advance. See attached file.
AvailableSolicits sealed bids for operate the valves that are necessary to isolate the main; supply and deliver two (2) 36" gate valves (american darling 36" mj x mj resilient wedge gate valve with stainless steel stem); supply and deliver two (2) 36" cut in sleeves at both project locations; provide and install the bike path closure signage; replace any impacted bike path up to 70 lineal feet at each location; restore site final grading and reseeding up to 70' x 50' at each location; during the shutdown, replace three existing air release valves along the isolated main away from the two valve replacement sites.
Posted Date
Dec 22, 2025
Due Date
Jan 26, 2026
Release: Dec 22, 2025
Close: Jan 26, 2026
Solicits sealed bids for operate the valves that are necessary to isolate the main; supply and deliver two (2) 36" gate valves (american darling 36" mj x mj resilient wedge gate valve with stainless steel stem); supply and deliver two (2) 36" cut in sleeves at both project locations; provide and install the bike path closure signage; replace any impacted bike path up to 70 lineal feet at each location; restore site final grading and reseeding up to 70' x 50' at each location; during the shutdown, replace three existing air release valves along the isolated main away from the two valve replacement sites.
AvailableThis RFP is for a single contract system to provide plumbing construction, including materials and labor, for the Questar III BOCES Well Water Tank Replacement Project.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
This RFP is for a single contract system to provide plumbing construction, including materials and labor, for the Questar III BOCES Well Water Tank Replacement Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →