National Office - DO OTPS/TOPS
FederalMD
Aug 20, 2026
Closes
Sep 8, 2026
Chiller Phase 1 - HVAC Riser Survey
1 LS of Mobilization; 24 HR of Review of existing drawings/determine riser locations markup; 105 HR of Verify/ measure existing chilled and heating hot water riser takeoff sizes and document. 30 HR of Measuring & determining the location for the new isolation control valves. See attached file.