Cooling Coil, Air, Duct- San Diego -(Request for Quotation)
Cooling coil, air, duct, NSN 4130013481551, Qty 10 UI Ea
Description: Phase I: Safety Isolation & Refrigerant Recovery: Lockout/Tagout (LOTO): Isolate all electrical power sources to Chiller 1 in compliance with OSHA safety protocols to ensure a zero-energy state. Refrigerant Recovery: Connect an EPA-certified recovery unit to Circuit 2. Recover all remaining R410A refrigerant into clean, certified recovery cylinders. Document the total weight of the recovered gas. Phase II: Component Demolition & Installation: Coil Demolition: Unbraze and unbolt the leaking condenser coil. Properly rig, lift, and remove the damaged section from the chiller frame. See attached file.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Aug 5, 2026
Closes
Aug 17, 2026
Cooling coil, air, duct, NSN 4130013481551, Qty 10 UI Ea
FederalNM
Aug 10, 2026
Closes
Aug 17, 2026
Commercial HVAC chiller repair or maintenance.
W7NH USPFO Activity Msang CRTC
FederalMS
Aug 10, 2026
Closes
Aug 19, 2026
Twin XL mattresses – Qty 110: Twin XL mattress must be 38"x 80"; Mattress thickness is preferred to be no less than 11"; Mattress should have a foam frame of not less than 3.75"; Mattress must have at least 312 inner coil springs made of at least 13-gauge wire; Mattress must be fully encased in a nylon ticking which must be bacterial/fungal and fire resistant; Mattress must be double-sided/reversible; Mattress must have at least an industry standard warranty. See attached file.
FederalVA
Aug 11, 2026
Closes
Sep 7, 2026
The contractor shall furnish all labor, materials, transportation, tools, equipment, resources, and supervision required to complete the project as described. The contractor must adhere to all applicable safety regulations and base requirements. Phase 1: site preparation: Protection of Adjacent Areas: The contractor will take reasonable care to protect surrounding walls, baseboards, and any remaining fixtures from damage during the work. Furniture and Personal Items: Basic furniture moving is included. Government personnel will empty heavy filing cabinets if necessary. The client is responsible for removing all small, fragile, and personal items from the work area. Any large or specialty items (e.g., pianos, pool tables) must be moved by the client prior to the start of work. Measurements: The contractor shall be responsible for measuring and verifying the area and perimeter of all spaces receiving carpet, cove base and door transitions. Contractor shall submit physical samples of carpet, transitions, cove base, and LVT to customer prior to installation. See attached file.
Procurement and program contacts connected to Food Safety and Inspection Service.