Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Finance Authority
Replacing (2) water cooled chillers, (2) cooling towers, and (2) chilled water pumps. The construction work includes piping, electrical, controls, miscellaneous material and all labor to provide a complete and operable system for the central cooling plant at the state hospital.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Salinas Valley Memorial Healthcare District
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Salinas Valley Memorial Healthcare District
Close: Dec 9, 2025
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
California Department of Corrections and Rehabilitation
Chiller plant and cooling tower maintenance and repair services.
Posted Date
Nov 5, 2025
Due Date
Dec 4, 2025
Release: Nov 5, 2025
California Department of Corrections and Rehabilitation
Close: Dec 4, 2025
Chiller plant and cooling tower maintenance and repair services.
AvailableAlabama Department of Veterans Affairs
Work includes the removal and replacement of adva's existing cooling tower.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Alabama Department of Veterans Affairs
Close: Dec 18, 2025
Work includes the removal and replacement of adva's existing cooling tower.
AvailableDickinson State University
Repairs and or replacement of the cooling tower and accessories.
Posted Date
Sep 25, 2025
Due Date
Dec 12, 2025
Release: Sep 25, 2025
Dickinson State University
Close: Dec 12, 2025
Repairs and or replacement of the cooling tower and accessories.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →