Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacing (2) water cooled chillers, (2) cooling towers, and (2) chilled water pumps. The construction work includes piping, electrical, controls, miscellaneous material and all labor to provide a complete and operable system for the central cooling plant at the state hospital.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of existing cooling tower with cooling tower of same design capacity and similar footprint.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Replacement of existing cooling tower with cooling tower of same design capacity and similar footprint.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes cooling tower replacement.
Posted Date
Jan 28, 2026
Due Date
Mar 4, 2026
Release: Jan 28, 2026
Close: Mar 4, 2026
Work includes cooling tower replacement.
AvailableFurnish and install a 1,000 ton cooling tower along with associated pump and piping to replace the existing cooling tower.
Posted Date
Dec 16, 2025
Due Date
Feb 5, 2026
Release: Dec 16, 2025
Close: Feb 5, 2026
Furnish and install a 1,000 ton cooling tower along with associated pump and piping to replace the existing cooling tower.
AvailablePalm Beach County is soliciting bids for the replacement of two cooling towers and pumps at the 2300 Vista Center in West Palm Beach. This project is part of the County's Annual Contract for HVAC Services and requires contractors to be qualified through the County's Vendor Self-Service system. A mandatory pre-bid meeting was previously scheduled for November 2025, and Gartek Engineering Corporation is the designated Architect/Engineer of Record.
Posted Date
Jan 28, 2026
Due Date
Mar 12, 2026
Release: Jan 28, 2026
Close: Mar 12, 2026
Palm Beach County is soliciting bids for the replacement of two cooling towers and pumps at the 2300 Vista Center in West Palm Beach. This project is part of the County's Annual Contract for HVAC Services and requires contractors to be qualified through the County's Vendor Self-Service system. A mandatory pre-bid meeting was previously scheduled for November 2025, and Gartek Engineering Corporation is the designated Architect/Engineer of Record.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →