Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of North Carolina at Chapel Hill issued IFB #3000012615 for the Chilled Water Infrastructure Expansion at the North Chiller Plant to procure and install owner-prepurchased cooling towers and associated equipment. Bids are due February 24, 2026 at 1:00 PM EST and the solicitation is listed as Open on the State of North Carolina electronic Vendor Portal. Bidders must be registered vendors in North Carolina and submit required attachments including HUB participation and warranty information.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes HVAC mechanical project involving replacement of chiller, cooling towers, and distribution pumps at university's west green chilled water plant.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Work includes HVAC mechanical project involving replacement of chiller, cooling towers, and distribution pumps at university's west green chilled water plant.
AvailableWork consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Posted Date
Aug 18, 2025
Due Date
Jan 21, 2026
Release: Aug 18, 2025
Close: Jan 21, 2026
Work includes installation of process variable frequency drive (VFD) system.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Work includes installation of process variable frequency drive (VFD) system.
AvailableEast Carolina University is soliciting construction bids to replace the cooling towers at the Minges Central Chiller Plant #2. The work includes replacement of existing cooling towers and associated mechanical, electrical, pumps, chemical treatment devices, and controls. Bids are submitted via North Carolina's eVP portal, and the solicitation is currently open with a response deadline of January 27, 2026.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
East Carolina University is soliciting construction bids to replace the cooling towers at the Minges Central Chiller Plant #2. The work includes replacement of existing cooling towers and associated mechanical, electrical, pumps, chemical treatment devices, and controls. Bids are submitted via North Carolina's eVP portal, and the solicitation is currently open with a response deadline of January 27, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.