CityTX
Posted
Sep 25, 2026
Oct 22, 2026
Raymond Park Dam Repair RFP
Work includes install temporary traffic control, 275 LF silt fence, 30 LF organic filter tube, 2 EA gabion check dam, tree protection, tree removal, 8 LF remove existing 6 ft x 3 ft box culvert, 80 CY remove and haul off concrete riprap, rubble and debris, remove existing exposed 8" PVC pipe, cap remaining and abandon in place, 1 EA 8 ft x 8 ft junction box provide and construct complete in place. See outside link.
