Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Montrose Redevelopment Authority (TIRZ 27) is soliciting bids to reconstruct sidewalks and ADA‑compliant wheelchair ramps in Houston’s Cherryhurst neighborhood (Harris County, TX). The scope includes new 5‑foot sidewalks, wheelchair ramps, concrete leveling, minor drainage, tree protection measures, and related incidental work. Bids are submitted via Civcast and are due on January 5, 2026, at 2:00 PM CST; the project is partially funded by a METRO 5310 grant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Montrose Redevelopment Authority (TIRZ 27) is soliciting sealed bids for the Cherryhurst Sidewalk Improvements project in Houston, Texas. The work includes reconstructing 5‑foot sidewalks, ADA‑compliant ramps, tree protection, and minor drainage and utility adjustments in the Cherryhurst neighborhood. Bids are submitted online via CivCast and are due January 5, 2026 at 2:00 PM CST; a mandatory pre‑bid was held December 22, 2025.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
The Montrose Redevelopment Authority (TIRZ 27) is soliciting sealed bids for the Cherryhurst Sidewalk Improvements project in Houston, Texas. The work includes reconstructing 5‑foot sidewalks, ADA‑compliant ramps, tree protection, and minor drainage and utility adjustments in the Cherryhurst neighborhood. Bids are submitted online via CivCast and are due January 5, 2026 at 2:00 PM CST; a mandatory pre‑bid was held December 22, 2025.
AvailableReconstructing 5-Ft (typical) sidewalks and ADA-compliant wheelchair ramps, concrete leveling, and tree protection, which comprises of matching existing sidewalk widths at trees or installing a slip-resistant galvanized steel plate over the roots. There is also some minor drainage installation, coarse sand under sod, adjusting water meters, and other minor utility work.
Posted Date
Dec 11, 2025
Due Date
Jan 5, 2026
Release: Dec 11, 2025
Close: Jan 5, 2026
Reconstructing 5-Ft (typical) sidewalks and ADA-compliant wheelchair ramps, concrete leveling, and tree protection, which comprises of matching existing sidewalk widths at trees or installing a slip-resistant galvanized steel plate over the roots. There is also some minor drainage installation, coarse sand under sod, adjusting water meters, and other minor utility work.
Work includes 126 CY 6" asphalt concrete base roads; 4 CY 6" aggregate base driveways; 11 CY 6" crushed limestone, driveways; 45 CY 2" asphalt concrete surface course; 4 CY rock channel protection; 2,150 LF type 2 concrete curb and gutter w/6" 304 base; 785 LF type 2 modified 8" curb and gutter w/ 6" 304 base; 11 EA no 3A catch basin; 592 LF 12" storm conduit; 788 LF 15" storm conduit; 11 CY furnished topsoil; 709 SY seeding and mulching w/fertilizer; 27,483 SF pavement removal and disposal; 3,713 SY subgrade compaction; 11 CY aggregate base 6" driveways. See attached file.
Posted Date
Oct 15, 2025
Due Date
Jan 14, 2026
Release: Oct 15, 2025
Close: Jan 14, 2026
Work includes 126 CY 6" asphalt concrete base roads; 4 CY 6" aggregate base driveways; 11 CY 6" crushed limestone, driveways; 45 CY 2" asphalt concrete surface course; 4 CY rock channel protection; 2,150 LF type 2 concrete curb and gutter w/6" 304 base; 785 LF type 2 modified 8" curb and gutter w/ 6" 304 base; 11 EA no 3A catch basin; 592 LF 12" storm conduit; 788 LF 15" storm conduit; 11 CY furnished topsoil; 709 SY seeding and mulching w/fertilizer; 27,483 SF pavement removal and disposal; 3,713 SY subgrade compaction; 11 CY aggregate base 6" driveways. See attached file.
Work includes construction of 5' wide concrete sidewalk, access connections, culverts, and any incidental work. The total length of the improvements is approx. 2,365 LF of sidewalk.
Posted Date
Nov 20, 2025
Due Date
Jan 6, 2026
Release: Nov 20, 2025
Close: Jan 6, 2026
Work includes construction of 5' wide concrete sidewalk, access connections, culverts, and any incidental work. The total length of the improvements is approx. 2,365 LF of sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis