Cherry Laurel Dr Drainage
Work includes approx 48.7 CY 2" asphalt concrete; 4,551.60 SY milling asphalt pavement; 440 LF 18" RCP side drain pipe; 460 LF concrete curb and gutter; 600 SY slab sodding.
Description: Replace existing and/or install new drainage pipe and storm drain structures for approx. 400 LF. Pipe size is expected to range from 24 to 42-inch diameter and may be either specified HDPE or RCP depending on final design. The project is expected to include asphalt pavement repair and/or resurfacing of the roadway and/or driveways. While most of the work is anticipated to be located within existing road right of way, some work may require restoration of private property and/or drainage easements.
City · SC, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CountyLA
Aug 12, 2026
Closes
Sep 9, 2026
Work includes approx 48.7 CY 2" asphalt concrete; 4,551.60 SY milling asphalt pavement; 440 LF 18" RCP side drain pipe; 460 LF concrete curb and gutter; 600 SY slab sodding.
CountyLA
Aug 12, 2026
Closes
Sep 9, 2026
Work includes approx 48.7 CY 2" asphalt concrete; 4,551.60 SY milling asphalt pavement; 440 LF 18" RCP side drain pipe; 460 LF concrete curb and gutter; 600 SY slab sodding.
CityNC
Oct 15, 2027
Closes
Dec 31, 2027
The Piccadilly Storm Drainage Improvement Project aims to improve storm drainage infrastructure, including pipe systems and culverts, to reduce flooding. The project also focuses on enhancing degraded stream reaches to reduce erosion and improve water quality within the designated area. It is currently listed as an upcoming construction project for Charlotte Storm Water Services with an anticipated posting date in late 2027.
CityNC
Feb 1, 2027
Closes
Feb 1, 2027
The Hidden Valley Storm Drainage Improvement Project involves the assessment, design, and construction of stormwater conveyance improvements to address flooding at 18 structures and 7 road sections. The project area is bounded by I-85, Cinderella Road, Echo Glen Road, and West Sugar Creek Road. The City of Charlotte requires contractors to provide various insurance coverages and construction bonds, including bid, payment, and performance bonds.