Closing soon

CG Station Burlington Replacement Water Heaters RFP

Description: The contractor shall furnish all labor, supervision, materials, tools, equipment, permits, transportation, removal, disposal, testing, startup support, and incidental services necessary to remove and replace the existing domestic hot-water heater equipment. The contractor shall: 1. Verify existing conditions before beginning work. 2. Safely isolate, drain, disconnect, remove, and dispose of the existing failed domestic hot-water heaters. 3. Furnish and install two new commercial natural-gas domestic hot-water heaters, rheem or equal, matching the existing system s required aggregate capacity, input, recovery capability, electrical requirements, physical fit, and venting configuration. See attached file.

Buyer
Base CAPE Cod (00052)

Federal · MA, US

Released
Nov 9, 2026
Closes
Nov 23, 2026(9 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts